Studi Kasus Penjadwalan Proyek: Frame Acid Skid dengan Gant Chart dan Critical Path Method
DOI:
https://doi.org/10.31884/journalofappliedmechanicaltechnology.v3i1.53Keywords:
Acid Skid, Critical Path Method, Gant Chart, Manajemen proyek, ProyekAbstract
This study examines the scheduling of the Frame Acid Skid project at the Lombok Steam Power Plant (PLTU) using Gantt Chart and Critical Path Method (CPM). The primary objective is to identify the causes of delays and propose optimization measures for the project duration. Data collected indicates a significant difference between the planned duration (24 days) and the actual project completion time (47 days). The main delays occurred in the welding and painting phases, each requiring an additional 13 days. Contributing factors include the addition of a welding process for materials not covered in the initial contract and specification mismatches in the painting phase. Analysis with Gantt Chart and CPM reveals that enhanced communication, more detailed initial planning, and strict monitoring of project specifications are crucial to minimize the impact of delays on cost and time. The results of this study provide a strong basis for decision-making in similar future projects.
References
J Kuster, Eugen Huber, Robert Lippmann, Alphons Schmid, Emil Schneider, Urs Witschi, & Roger w. (2015). Project Management Handbook. Springer.
Turner. (1998). The Handbook of Project-Based Management: Improving the Process for Achieving Strategic Objectives.
Kerzner, H. (2015). Project management: a systems approach to planning, scheduling, and controlling, 11th edition.
Andersen, E. S. (2008). Rethinking Project Management— An Organisational Perspective. Prentice Hall
A. M. ALIYU. (2012). PROJECT MANAGEMENT USING CRITICAL PATH METHOD (CPM): APRAGMATIC STUDY. GLOBAL JOURNAL OF PURE AND APPLIED SCIENCES, : 18(3-4), p. 197–206
Joana Geraldi. (2012). Gant Chart and the Scientific Management in Projects . International Journal of Managing Projects in Business.
W. Agyei. (2015). ‘Project Planning and Scheduling Using PERT and CPM Techniques With Linear Programming : Case Study.’ International Journal of Scientific & Technology Research.
George Ellis. (2016). Project Management in Product Development. Butterworth-Heinemann
Taynara Takami Narita, Júlio de Mesquita Filho, Caio Henrique Alberconi, Júlio de Mesquita Filho, & Fernando Bernardi de Souza. (n.d.). Comparison of PERT/CPM and CCPM Methods in Project Time Management.
John Wiley & Sons, Hoboken, NJ. DESTİCİOĞLU TAŞDEMİR. (2022). PROJECT PLANNING WITH CPM AND PERT METHODS: EXAMPLE OF DEFENCE INDUSTRY*. Journal of Naval Sciences and Engineering, 18(2), p. 363–385.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Journal of Applied Mechanical Technology
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.